– New 6 kV, 0.4 kV substations and MCC for Electrolysis Factory, 2010 – Retrofit of 20/6 kV switchgear and control room of Kaleto 2 Pumping Station, 2010
– Retrofit of 6 kV switchgear cubicles in 110/6 kV substation, 2010
– Manufacture and delivery of LV switchboards, 2010
– Retrofit of 6 kV switchgear cubicles, 2010 – Manufacture and delivery of LV switchboards, 2010
– Construction of Suvorovo Wind Park, 2010
– Manufacture and delivery of electrical facilities for ORT Bulgaria, 2010 – Manufacture and delivery of LV switchboards for Raduga – Kamchiya Resort Complex, 2010 – Manufacture and delivery of LV switchboards for Sofia Airport Center, 2010
– Complete electrical construction of Kardam Wind Park, 2010
– Retrofit MV – design and manufacturing of panels for secondary commutation, 2009 – Retrofit MV – development and manufacturing of primary commutation, 2010
– Modernization of 20 kV switchgear cubicles in 110/20 kV Albena Substation, 2009 – New 0.4 kV switchgear type SIVACON in Make up Water Pumping Station, 2009
– Modernization of 110/6 kV Kubratovo Substation, 2009 – Design, delivery and installation of automatic switch-over in 20 kV switchgear in Bistritsa Potable Water Treatment Plant, 2010
– Modernization of Kamenitsa Hydro Power Plant, 2008 – Modernization of Kalin Hydro Power Plant, 2009
– Modernization of 20 kV substation in Veliko Tarnovo Radio Factory, 2008 – Modernization of 20 kV Dobrich 1 Substation Node, 2009
– Modernization of Rectifier Substation 15, Metrostation 3, 2008
– Construction of the electrical part of the New Crushing 3 Corps, 2008, 2009
– Modernization of Substation 185, 2008 – Modernization of LV Substation 179, 2009
– Construction of electrical part of Balchik Waste Water Treatment Plant, 2008, 2009
– Construction of the energy part of Kavarna Wind Park, 2008, 2009 – Construction of the energy part of Kamen Bryag Wind Park, 2009
– Cable power line 10 kV – Three substations 10/0.4 kV; 2x1600 kVА, 2007
– Reconstruction of 110/20/6 kV Mirkovo Substation – Retrofit of 20 kV and 6 kV switchgears – Reconstruction of 110/20/6 kV Buhovo Substation – Retrofit of 6 kV switchgear, 2007
– Manufacturing, delivery and installation of 20 kV Plant Substation – Five substations – 20/0.4 kV/2500 kVА – Lighting installations, 2007
– Replacement of relay protections in 110 kV switchgear, 2007 – Retrofit and automatic switch-on of the spare supply of 6 kV switchgear, 2007
– LV substation type SIVACON, 2007
– Reconstruction of substation 4
Desulphurization Plant – Design, manufacturing and delivery of type tested 0.4 kV switchgear type SIVACON 8PT – Design and manufacturing of secondary commutation of 6 kV switchgear, 2007
Dzhenevra Pumping Station – Design, delivery, installation and commissioning of 24 kV and 7.2 kV switchgears, 2007 г. Beglika Pumping Station – Design, delivery, installation and commissioning of 24 kV and 7.2 kV switchgears, 2006 Devin HPP – Design, delivery and commissioning of five vacuum circuit-breakers, 2006
– Retrofit of 20 kV Duni Substation, 2006
Metallurgical Plant in Serbia – Manufacturing and delivery of LV switchboards, 2006
Substation 224 – Retrofit of 6 kV switchgear, 2006
– Reconstruction of Main Lowering Substation 110/6 kV, 2006
Elatsite Med AD – Complete engineering of Electro part and automatization of KET 3. 2006
– Package transformer substation 4x250 kVA, 2006
Flotation Department – LV switchboards – 106 pcs. – Switchboards for frequency inverters, UPS and equipment – 9 pcs – Complete type tested LV substation 2x1250 kVA, 2006
ESDC – LV KTP 10, 2006 Pumping Station – 0.4 kV LV switchgear with LV switchboard type SIVACON, 2006 Scrap Workshop – 0.4 kV LV switchgear with LV switchboard type SIVACON – LV switchboards for supply of trolleys and repair switchboards – 24 pcs, 2006
– MV switchboards – 4 pcs., 2006
– 6 kV portable switchgear for supply of excavators – 6/0.4 kV package transformer substation for the mine, 2006 – LV capacitor compensating installation
– Complete engineering for replacement of LV switchgear, 2006
– Package transformer substations – 6 pcs.
– Package transformer substation – 3х630 kVA, 2005
– Adjustment and commissioning of MV and LV distribution switchboard, 2005
– Package transformer substations 0.4/20 kV, 2005
Substation 214 – Manufacturing and delivery of LV switchboards type SIVACON, 2005 Substation 493 – Design and manufacturing of main switchboards 0.4 kV type SIVACON, 2005
– Modernization of interlocks for 6 kV switchgear – Manufacturing LV switchboards for modernization of Unit No. 5 and Unit No. 6, 2005
– Electrical Power Transmission Utility,Varna – LV control switchboards, 2005
– Reconstruction of 20 kV distribution switchboard – Retrofit – New main switchboards 0.4 kV, 2005
– Manufacturing and delivery of LV switchboards type SIVACON, form 4, 2005
– Manufacturing, installation and commissioning of six LV substations type SIVACON, 2005 – Installation and commissioning of MV switchgear and MV/LV transformers, 2004
– New substations 6/0.4 kV; 2x800 kVA, 2004 – Frequency inverters for middling slime pumps, 2005 – Flotation workshop – LV switchboards type SIVACON, 2005
– Reconstruction of Rudnichna Substation 110/6 kV and main-step down substation 110/20/6 kV, 2004 – Retrofit of 20/6 kV switchgear at Oborotna Substation, 2005 – Frequency inverters for middling slime pumps –12 pcs, 2005
– Pastra HPP – Reconstruction of switchyard, switchgear and control room, 2004 – Rila HPP – Reconstruction of switchyard, switchgear and control room, 2005
Reconstruction of Unit No. 2 – Retrofit of 6 kV switchgear – Modernization of LV distribution switchboard, 2004
– Transformеr substation 20/0.4 kV; 2x630 kVA – two pcs, 2004
– Design, delivery and commissioning of generator protection relays, 2004
– Reconstruction of 10 kV switchgear, 2004
– Underground railway station No. 1, track substation No. 17 – Retrofit of 10 kV switchgear, 2004
– Transformer substation 20/0.4 kV; 2x630 kVA – LV switchboards, complete plant erection – electrical part, 2004
Substation 223 – Complete Retrofit of 6 kV substation – Design and commissioning of synchronic motors protection relays, line differential protection relays and ultra speed automatic switch-over, 2003 Substation 003 – Design, mounting and commissioning of LV switchboards – type Motor-Control-Center, 2003
– Design, supply and commissioning of 6 kV switchgear, 2003
Design and supply of 6 kV switchgear, 2003
– Electrical power supply 20 kV and complete transformer substation, 2003
– LV switchboards andcontrol, 2003 Sofia, – Transformer substation 2x1000 kVA – 10 kV switchgear and LV main switchboard, 2003
– Complete dispatching system of 20 kV substation, 2003 – Manufacture, delivery and commissioning of 20 kV switchgear, 2002
Substation 003 – Reconstruction of 6 kV substation – Retrofit, 2002 Substation 002 – Design, manufacturing and delivery of LV switchboards, 2002
– Retrofit of 20 kV substation, 2002
– Complete erection of electrical part; substation 10 kV and 10 kV external line, 2001 – Srechenska Bara Dam – Reconstruction of 20 kV switchgear, 2001
– Complete external MV supply system and LV switchgear, 2000
– Reconstruction of 10 kV switchgear, 2000
Reconstruction of furnace No. 1 – LV switchgear, 2001 г. – Reconstruction of 6 kV substation 515, 2002
Printing establishment – Bulgaria, Varna East – Projecting and maintenance of external power supply 20 kV and reconstruction of Maksuda and Sever substations, complete transformer substation – 20/0.4 kV, 2001 Printing establishment – Bulgaria, Varna – Complete erection of electrical part, 2002
– Terminal for Sulfuric Acid – Port Varna West – Complete erection of electrical part; 20 kV substation and 20 kV external lines – Electrical installations and switchboards, 2001 – Reconstruction of 20/6 kV substation, 2001
– Reconstruction and modernization of 6 kV substation of underground railway station No. 5, 2001
– LV switchgear – two units, 2000, 2002
– Design, manufacturing and delivery of new substations – five pcs, 2001, 2002 – Substation No. 55 – 6 kV with power factor compensation unit 6 kV, 2002
– Reconstruction of 110/6/6 kV substation, control commutation, 2000 – Reconstruction of substations No. 1 and No. 2, Main Unit, 2002
– Complete delivery of LV switchboards for temporary effluent treatment project, 2000
– Manufacturing and commissioning of LV substation No. 4, 2000
– Complete delivery of LV switchboards,1999
– LV switchboards,1999
– Reconstruction of substation 002 – 6 kV Complete design, manufacture, delivery and commissioni – Substation 20/6 kV, distribution substation – 6 kV, 1998 – Reconstruction of substations No. 1 and No. 2 – Main Unit, 6 kV – Reconstruction of 6 kV Middle and Fine Crushing Substation, 2002
– Reconstruction of 6 kV Central Substation,1998
– Petrol stations in Varna, Dobrich, Sofia, Yambol – Complete mounting of the electric power supply, 1996
– Reconstruction of 6 kV substations No. 101 and 103, 1997
Modernization and reconstruction of: – Mining Substation – 6 kV, 1995 – Main Body Substation – 6 kV, 1996 – Middle and Fine Crushing Substation – 6 kV, 1996
|
|