Български (България)English (United Kingdom)
NEWS

The first plant for production of electrolytic copper from enriched copper solutions was put into operation in Asarel Medet AD with the participation of ELIA Plc.

All electric medium and low voltage power facilities were produced by ELIA Plc.


image1 image2

Medium voltage substation type SIMOPRIME was assembled in ELIA Electrical Equipment Plant in Dobrich. Main switchboards and switchboards type MCC – SIVACON were produced in ELIA Electrical Equipment Plant in Dobrich under franchise contract with Siemens AG.